CoinsValue.net logo CoinsValue.net logo
Cryptopolitan 2025-08-26 20:45:58

Hut 8 is seeking financing to move 1.53 GW of capacity from exclusivity into active development across four U.S. sites

Hut 8, the Bitcoin miner that has steadily reinvented itself as a digital infrastructure player, has secured $330 million in new credit facilities from Two Prime and Coinbase to accelerate its expansion into U.S. data centers. The fresh financing aims to move 1.53 gigawatts of previously exclusive capacity into active development in what could be the company’s most ambitious growth plan to date. Since the announcement, which was made on Tuesday, August 26, Hut 8’s stock has gone up by over 9% . The new facilities are projected to give Hut 8 more than 2.5 GW of total platform capacity once fully operational across 19 sites. That places it among the largest publicly listed players in digital infrastructure development. Hut 8 moves projects from exclusivity to development The announcement was accompanied by a reclassification of four U.S. sites from “exclusivity” into “capacity under development.” The four sites include a 300 MW campus in Louisiana, a 1,000 MW hub and 180 MW site in Texas, and a 50 MW facility in Illinois, which, when summed up, will yield 1,530 MW (1.53 GW) Once complete, the projects will significantly extend the company’s operational footprint. Hut 8 already operates mining facilities in Canada and the U.S., but these new builds push the firm deeper into the power-dense, high-demand world of AI and high-performance compute (HPC). This isn’t the first time Hut 8 has signaled its intent to play in both crypto and AI markets. Earlier this year, it broke ground on a $2.5 billion AI data center campus in Louisiana, designed to house some of the largest GPU clusters in North America. By folding new credit lines into its balance sheet, the company is now doubling down on both sides of its business, which are scaling Bitcoin mining while also constructing energy-intensive infrastructure that AI clients will pay top dollar to access. Trump-backed miners chase ambitions with capital The $330 million in new credit facilities carries a weighted cost of 8.4% and complements the recently announced $1 billion ATM equity program and its Bitcoin treasury, which holds more than 10,000 BTC worth about $1.2 billion, giving the company multiple levers to pull as market conditions shift. By relying on a blend of equity, debt, and crypto reserves, Hut 8 has given itself breathing room to execute on an ambitious buildout without betting the farm on Bitcoin’s next halving cycle. Risks and stakes ahead Execution risk remains the biggest question mark. Hut 8 must manage construction timelines, secure long-term power arrangements, and compete with entrenched data center operators already chasing AI’s insatiable demand for compute. Any delays or cost overruns could put strain on its balance sheet, even with diversified financing in place. At the same time, Hut 8 is betting that AI demand will remain elevated for years, providing a steady customer base beyond Bitcoin mining. With both crypto and AI industries continuing to scale, the company is attempting to sit at the intersection of two of the fastest-moving sectors in digital infrastructure. For now, investors are rewarding the ambition. With more than $330 million in fresh credit, $1 billion in equity firepower, and billions in Bitcoin reserves, Hut 8 has created the financial cushion to pursue projects that could cement its place in the market. Your crypto news deserves attention - KEY Difference Wire puts you on 250+ top sites

阅读免责声明 : 此处提供的所有内容我们的网站,超链接网站,相关应用程序,论坛,博客,社交媒体帐户和其他平台(“网站”)仅供您提供一般信息,从第三方采购。 我们不对与我们的内容有任何形式的保证,包括但不限于准确性和更新性。 我们提供的内容中没有任何内容构成财务建议,法律建议或任何其他形式的建议,以满足您对任何目的的特定依赖。 任何使用或依赖我们的内容完全由您自行承担风险和自由裁量权。 在依赖它们之前,您应该进行自己的研究,审查,分析和验证我们的内容。 交易是一项高风险的活动,可能导致重大损失,因此请在做出任何决定之前咨询您的财务顾问。 我们网站上的任何内容均不构成招揽或要约